Skip to Content

Major Projects 


  • External building paint
    Parking space outside the society gate

  • Major Civil repairs strengthing the whole structure 

    Water proofing of Roofs

  • Uniform overhead Water storage tanks 

    Cable free Society , Removing  numerous unwanted bundles of cables

Cool look to security room with ceremic tiles both internal as well external side

  • Solar plant of 15 KW for common areas 

    Boom Barrier on the gate for better control of vehicles 

  • Development of additional space for parking

    Renovation of Society common room ( Mandir)

  • CCTV Cameras 

    Peripheral Road with Interlocking Tiles 
    Digital Society 
    Converting multi points society lighting to a single point
    Additional lighting in the campus for adequate luminous 
    Converting security from contractor to society role 
    Chemical cleaning of water tanks relacing nonhyginic conventional manual cleaning